Pump inspection at the supplier

Centrifugal pumps, plunger pumps and pump packages verified before shipment: documents, nameplates, witnessed tests, electrical checks and packing.

Skid-mounted pump package before shipment
90 kW pump package during pre-shipment inspection · Italy, 2026
01

Equipment

Rotating equipment for process, mining, oil & gas and energy plants.

Centrifugal pumpsPlunger pumpsSkid-mounted pump packagesIndustrial centrifugesElectric motors and gear motorsHydraulic motors
02

What we check

We follow the approved ITP and witness the supplier's tests, recording measured values, test conditions and photos.

  • PMP-01

    Document review

    Datasheets, performance curves, material certificates, test procedures and calibration records.

  • PMP-02

    Visual and dimensional check

    Nozzles and flanges, baseplate, coupling and guards, interfaces per the outline drawing.

  • PMP-03

    Nameplates and traceability

    Pump and motor nameplates checked against datasheet and order: model, power, voltage, serial number.

  • PMP-04

    Hydrostatic test

    Pump casing tested at the required pressure and duration, with no leakage.

  • PMP-05

    Running tests

    Flow, head, absorbed power, vibration, noise and bearing temperatures, when specified.

  • PMP-06

    Electrical checks

    Insulation resistance, direction of rotation, current draw, panels and connections.

  • PMP-07

    Coating and protection

    Dry film thickness (DFT), protection of nozzles and machined surfaces.

  • PMP-08

    Pre-shipment inspection

    Quantities and codes against the packing list, spares and accessories, packing and marking.

  • IRN

    Release

    Report with photos and, when everything conforms, an Inspection Release Note for shipment.

03

Reference standards

We apply the standards named in the order and the client's specification. The most common for pumps and motors:

ScopeReference
Centrifugal pumps for petroleum and petrochemical industriesAPI 610 · ISO 13709
Hydraulic performance testsISO 9906
Centrifugal pumps for chemical processISO 5199
Reciprocating positive displacement pumpsAPI 674
Machine vibrationISO 20816
Rotating electrical machinesIEC 60034
Electrical panel during pre-shipment inspection
Control panel during pre-shipment inspection

Standards apply when required by the order; acceptance criteria are those of the approved specification.

Need an inspector at your supplier?

Send the PO, specification, ITP and supplier location. We reply with availability and a quotation within one working day.