A selection of assignments carried out in 2026 in Italy and Turkey. Client names are shown only with their consent; the others remain confidential.

Fugitive emission test on a valve
Helium test on a control valve · Florence, 2026
Control valve during factory testingCS-01
Control valves · Factory testing

Witnessed testing of control valves

Client
Baker Hughes
Site
Nuovo Pignone plant, Florence
Period
March 2026

On-site attendance at control valve testing per the test plan: dimensional and final inspection, functional and stroke tests, seat-plug leakage, gas test and fugitive emission test with helium and mass-spectrometer leak detector.

Results, measured values and photos recorded test by test in the inspection reports.

Electrical panel during pre-shipment inspectionCS-02
Pre-shipment inspection · Mining plant

Pumps, valves and electrical panels before shipment

Client
Mahdiabad Lead & Zinc
Supplier
MATEC, Mulazzo (MS), Italy
Period
April – June 2026

Pre-shipment inspection in several lots: 90 kW centrifugal pump packages, DN300 check valves, butterfly valves, electrical panels and filter plates. Quantities and codes checked against the packing list, nameplates, equipment condition, protection, packing and marking.

One report with photos per lot, with item-by-item reconciliation of the packing list.

Harmonic measurement screen during the FATCS-03
FAT · Electrical equipment

Factory acceptance test of active harmonic filters

Client
Confidential (project owner)
Site
Manufacturer in Tuscany
Period
April 2026

FAT of two active harmonic filters: document review, visual check of the panels and electrical functional test with measurement and compensation of current harmonics.

Test result: satisfactory. Report issued to the client with photos and records.

Mineral dewatering machine in the workshopCS-04
In-process and pre-shipment inspection · Mineral processing

Dewatering machine for minerals

Client
MATEC
Site
Manufacturer in Turkey
Period
August – September 2026

Inspection during fabrication and before shipment of a dewatering machine for mineral processing: welded and galvanized steelwork, conveyor structures, visual and dimensional checks, weld and galvanizing quality, components, packing and packing list.

Inspection reports for every item, with photos and packing-list reconciliation before shipment.

Sample reports and references available on request, respecting client confidentiality.

Need an inspector at your supplier?