CS-01Witnessed testing of control valves
- Client
- Baker Hughes
- Site
- Nuovo Pignone plant, Florence
- Period
- March 2026
On-site attendance at control valve testing per the test plan: dimensional and final inspection, functional and stroke tests, seat-plug leakage, gas test and fugitive emission test with helium and mass-spectrometer leak detector.
Results, measured values and photos recorded test by test in the inspection reports.



